Excipient sourcing: how to qualify the supplier, not only the material
Two lots of the same excipient can meet the same monograph and still behave differently in your process. The supplier behind them is what you qualify.
How do you qualify an excipient supplier before the first order?
Identify the site that actually makes the excipient, send a supplier questionnaire, review the quality documents and the supplier's commitment to notify changes, decide from the risk whether an audit is needed, test samples against your full specification, sign a quality agreement, then approve that supplier on record for that material, grade and site only.
Excipients are often bought the way commodities are bought: a grade is named, a monograph is quoted, three prices are compared. That works until a new lot flows differently in the tablet press, a coating behaves differently in the pan, or an auditor asks how the supplier was approved and the file holds a certificate of analysis and an invoice.
Qualifying the supplier is what closes that gap. The material is tested against the specification; the supplier is assessed for whether it can deliver that material consistently, tell you when something changes, and stand behind its documents. This article covers the qualification process itself. What an excipient GMP certificate does and does not show is covered separately in excipient GMP. The depth of qualification your own quality system and regulator expect depends on the product and its route of administration, so follow your own procedure where it is stricter.
Who are you actually qualifying?
Start by naming the manufacturing site. Excipients often pass through more than one company: a manufacturer, a repacker, a distributor and an exporter. Each step can relabel, repack or split a lot. Ask the supplier to state who manufactures the material, at which address, and what happens to it between that site and you. If the answer is a distributor, the distributor is part of what you qualify, and its handling, storage and repacking need to be visible in the documents.
Qualification belongs to a specific combination of material, grade and site. A supplier approved for one grade of a cellulose from one plant is not thereby approved for another grade, or for the same grade made elsewhere.
What should the supplier questionnaire establish?
A questionnaire gives you the same set of facts from every candidate, in writing, signed by someone accountable. It should establish:
- The legal entity and the manufacturing site, with addresses, and whether the excipient is made, repacked or only traded there.
- The quality system in place, the certificates held and their scope.
- How the process and its controls are documented, and how lots are defined and traced.
- The change notification commitment: which changes the supplier will tell you about, and how far in advance.
- Statements your product needs, such as origin of animal derived materials, allergens, residual solvents and elemental impurities, where they apply.
- Complaint handling and how a deviation affecting a delivered lot would be communicated.
Which documents should you review?
Read the supplier's specification against your own and against the pharmacopoeia you cite, including the edition. Ask for certificates of analysis from several recent lots, not one, and look at how results vary between them. Check the scope, site and validity of any quality certificate. Ask how the retest or expiry date is supported, which is explained in retest date or expiry date. Where the supplier holds a drug master file or a similar dossier for the excipient, ask what access it can give you.
Do you need to audit the supplier?
Decide this from risk, and record the reasoning. The factors are usually the route of administration of your product, how critical the excipient is to its performance, whether the material is novel or well established, what the questionnaire and documents showed, and the supplier's history with you or with others you trust. A low risk material from a well documented supplier may be qualified on paper. A critical functional excipient, or a supplier whose answers left gaps, calls for an audit. A remote audit can test records and people, but it has limits, set out in what a remote supplier audit can establish.
What should sample testing cover?
Test samples against your full specification, and compare your results with the supplier's certificate for the same lot. Where you can, test more than one lot, because qualification is about consistency. For excipients with a functional role, add the properties that matter in your process even if the monograph does not list them, such as particle size, flow or viscosity, and try the material in your process before relying on it.
Approval covers one material, one grade and one manufacturing site. Any change to one of the three is a new qualification question, not a detail for purchasing.
What closes the qualification?
Sign a quality agreement that sets out responsibilities, change notification, complaints and the documents supplied with each lot. The structure is the same as for an API, described in quality agreements. Then record the approval in your approved supplier list, with its scope, and set the triggers for review: a change notification, a complaint, a failed lot, or the periodic review your procedure sets.
If you need excipients sourced against a specification, see pharmaceutical excipients. For help assessing a supplier, see sourcing consultancy.
NJMC Medical Supplies is a sourcing, verification and consultancy company in Nanjing, China, serving hospitals and pharmaceutical buyers worldwide. The NJMC group also includes LNJC, a pharmaceutical company in Yemen, and PharmaTrust, a software product for certificate of analysis review.
Frequently asked questions
Can a distributor be an approved excipient supplier?
Yes, provided you know the manufacturer and the site behind the distributor, and the distributor's own handling, storage and any repacking are assessed and documented. The approval should name both. A distributor that will not disclose the manufacturing site cannot give you what qualification needs.
How many lots should be tested before approving an excipient supplier?
Your own procedure sets the number, and it should reflect the risk of the material. Testing more than one lot is common practice, because a single good lot shows only that the supplier can make the material once, not that it makes it consistently.
Does a GMP or quality certificate replace supplier qualification?
No. A certificate shows that a site was assessed against a standard at a point in time, for a stated scope. It does not show that the supplier meets your specification, will notify you of changes, or makes your grade at that site. It is one input to qualification, not the result.
When should an approved excipient supplier be requalified?
When something changes: the manufacturing site, the process, the grade, the supply chain or the supplier's quality system. Also after a complaint or a failed lot, and at the periodic review interval your procedure sets.
Check a certificate of analysis. PharmaTrust by NJMC, our own software, reads a certificate against the applicable specification and lists the points to raise with the supplier. Certificate check
Related pages
Tell us what you need to source
Send the product or molecule, the grade, the quantity and the destination market. You will get a considered answer about what can be sourced and what documentation comes with it.